ENERGY EFFICIENCY Industry Inspection for Imported Machinery and Equipment subject to Inspection
Inspection for Imported Machinery and Equipment subject to Inspection
Legal Ground
- Energy Use Rationalization Act, Article 39-2 (Inspection of Imported Machinery and Equipment subject to Inspection)
- Date of enforcement : Dec. 3, 2017
- Applicant for Inspection & Fee Payer : Manufacturer
Machinery and Equipment subject to inspection (Enforcement regulations of Energy Use Rationalization Act, Article 31-6)
Boiler
- Power boiler : water tube, fire tube, etc.
- Heating boiler
Pressure vessel
- class 1 pressure vessel
- class 2 pressure vessel
- ※ See applicable Provisions for details
Type of inspection and application (Enforcement regulations of Energy Use Rationalization Act, Article 31-7)
Welding Inspection, W.I.
- Inspection in case of fabrication of body, end plate and similar parts by welding, plus design Inspeciton
-
Application Documents
-
- Welding diagram, 1copy
-
- Design drawing 2copies
-
- Strength Calculation sheet, 1copy
-
- Inspection when fabricating steel sheet, tube or casting current by welding, expansion, assembly, casting, etc. , plus design Inspeciton.
- Application Documents : Certificate of Welding Inspection 1copy. 1 set document of Welding Inspection will be required to summit, in case of exemption items of Welding Inspection.
Structural Inspection, S.I.
Inspection Standard (Enforcement regulations of Energy Use Rationalization Act, Article 31-9)
- KS Code
- Notification of the Ministry